SiteTitle • | Cedar Creek/Cedar Lake TMDL Implementation Plan: Public Review Draft Report | [X] |
Organization • | Illinois Environmental Protection Agency, Bureau of Water | [X] |
| 1: | | Title: | | | | Volume/Number: | 2008 February 1 | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 02 08 2008 | | | Agency ID: | | | | ISL ID: | 000000043158 Original UID: 22673 FIRST WORD: Cedar | |
2: | | Title: | | | | Volume/Number: | 2008 February 1 | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 02 08 2008 | | | Agency ID: | | | | ISL ID: | 000000043159 Original UID: 22673 FIRST WORD: Cedar | |
|