Illinois State Library

Electronic Documents of Illinois


Search results for

Search:
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
000000041174 in XMLRecordID [X]
Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois in SiteTitle [X]
rss icon RSS
Results:  1 Item
Sorted by:  
Page: 1
SiteTitle
Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois[X]
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000041174[X]
DateCreated
1:

Title:  

Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois

 
 Volume/Number:  2004 March 
 Issuing Agency:   
 Description:  The City of Mattoon applied for and received a grant to conduct a diagnostic-feasibility study on Lake Paradise commencing in May 2000. The diagnostic study was designed to characterize existing lake conditions, examine the extent and causes of use impairment, and provide the basis for selection of restoration and management techniques The project was funded (60 percent) by the Illinois Environmental Protection Agency (Illinois EPA) through the Illinois Clean Lakes Program under Conservation 2000 with cost sharing by the City of Mattoon. The Illinois EPA was responsible for grant administration and program management. The Diagnostic-Feasibility Study was conducted by Crawford, Murphy and Tilly, Inc. (CMT), the Watershed Science Section of the Illinois State Water Survey (ISWS), and Goodpaster and Associates, Inc. (GAI). 
 Date Created:  05 21 2004 
 Agency ID:   
 ISL ID:  000000041174   Original UID: 21129 FIRST WORD: Phase