| SiteTitle | • | Project Manual Workbook | [X] | 
 | | 1: |  | Title:   |  |  |  |  | Volume/Number: | 1997 June |  |  |  | Issuing Agency: |  |  |  |  | Description: | This workbook has been prepared by the Illinois Capital Development Board for use with the 1997 Standard Documents for Construction (SDC) and the 1997 A/E Manual. This workbook contains instructions, forms and guide specification sections through Division 1. Several sections have been expanded for clarification purposes. A checklist of current technical guide specification sections is available from your CDB project manager on a project specific basis. Instructions to the A/E have been expanded and are included in the guide specification sections. |  |  |  | Date Created: | 06 1997 |  |  |  | Agency ID: |  |  |  |  | ISL ID: | 000000003230   Original UID: 3070 FIRST WORD: Project |  | 
 |