Illinois State Library

Electronic Documents of Illinois


Search results for

Search:
Illinois Department of Transportation in Organization [X]
rss icon RSS
Results:  3062 Items
Sorted by:  
Page: Prev  ...  11 12 13 14 15   ...  Next
Organization
Illinois Department of Transportation[X]
XMLRecordID
000000012707 (1)
000000014929 (1)
000000014988 (1)
000000014989 (1)
000000014990 (1)
DateCreated
241:

Title:  

McClugage Bridge Lane Closure

 
 Volume/Number:  2010 August 26 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that the westbound driving (right) lane on the McClugage Bridge will be closed Monday, August 30th through Thursday, September 2nd from 8:30 am to 5:30 pm each day. 
 Date Created:  08 26 2010 
 Agency ID:   
 ISL ID:  000000029062   Original UID: 13521 FIRST WORD: McClugage 
242:

Title:  

US 150 Kickapoo Project

 
 Volume/Number:  2010 August 26 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that construction work on US 150 from Mathis Ln. to Princeville-Jubilee Rd. just west of Kickapoo will begin Monday, August 30th. 
 Date Created:  08 26 2010 
 Agency ID:   
 ISL ID:  000000029063   Original UID: 13522 FIRST WORD: US 
243:

Title:  

IL 91 Project

 
 Volume/Number:  2010 August 26 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that work on IL 91 from Legion Hall Rd. to the north limits of the Village of Dunlap will begin Monday, August 30th. 
 Date Created:  08 26 2010 
 Agency ID:   
 ISL ID:  000000029064   Original UID: 13523 FIRST WORD: IL 
244:

Title:  

IL 2 North of Dixon

 
 Volume/Number:  2010 August 27 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on IL 2 north of Dixon will begin on Wednesday, September 1, 2010. Northwest Illinois Construction Company will be starting the $879,500 contract to improve the 3.5 mile section of IL 2 from Grand Detour to the north edge of Dixon. 
 Date Created:  08 27 2010 
 Agency ID:  Nr72-10 
 ISL ID:  000000029071   Original UID: 13528 FIRST WORD: IL 
245:

Title:  

US 30 North of Amboy

 
 Volume/Number:  2010 August 27 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on US 30 north of Amboy will begin on Wednesday, September 1, 2010. The 14 mile section of US 30 from US 52 to IL 251 will be improved by removing and replacing the shoulders and resurfacing the roadway. Northwest Illinois Construction Company is the contractor for the $5.2 million project. 
 Date Created:  08 27 2010 
 Agency ID:  Nr73-10 
 ISL ID:  000000029072   Original UID: 13529 FIRST WORD: US 
246:

Title:  

Interstate 74 to be closed 3 nights for the setting of bridge beams

 
 Volume/Number:  2010 August 30 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced today that weather permitting, Interstate 74 will be closed between the University Avenue exit at mile marker 185 and the Royal/ Ogden exit at mile marker 197 for the setting of new bridge beams on a series of nights. During the closure, motorists will be directed to a marked route detour utilizing the University Avenue exit, US Route 150, and Market Street in Ogden. There will be signs and message boards to guide motorists around the closure. 
 Date Created:  08 30 2010 
 Agency ID:   
 ISL ID:  000000029073   Original UID: 13531 FIRST WORD: Interstate 
247:

Title:  

I-55/70 at Exchange Avenue Re-opened

 
 Volume/Number:  2010 August 30 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation today announced that both directions of I-55/70 are now open from west of IL 203 to the I-55/70/64 split in East St. Louis, effective immediately. 
 Date Created:  08 30 2010 
 Agency ID:  76C55 
 ISL ID:  000000029074   Original UID: 13532 FIRST WORD: I 
248:

Title:  

US 50 in Salem

 
 Volume/Number:  2010 August 30 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation today announced that the intersection of U.S. 50 and Hoots Chapel Road will have lane closures beginning Tuesday, September 7, 2010, weather permitting. This work will consist of pavement widening for the addition of turn lanes, milling, and resurfacing the existing asphalt surface. 
 Date Created:  08 30 2010 
 Agency ID:  76D42 
 ISL ID:  000000029075   Original UID: 13533 FIRST WORD: US 
249:

Title:  

Illinois 49 at TPandW Railway crossing

 
 Volume/Number:  2010 August 31 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced today that the Illinois 49-TPandW Railway grade crossing located in Crescent City will be closed on Monday, September 13, 2010. 
 Date Created:  08 31 2010 
 Agency ID:   
 ISL ID:  000000029079   Original UID: 13537 FIRST WORD: Illinois 
250:

Title:  

Roadwork begins on Route 71, from Ottawa to Utica

 
 Volume/Number:  2010 August 30 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation has announced that Illinois Route 71 is scheduled for resurfacing beginning Tuesday, August 31, 2010. The work zone is located from IL 23 (Ottawa) to IL 178 (Utica). 
 Date Created:  08 30 2010 
 Agency ID:   
 ISL ID:  000000029086   Original UID: 13530 FIRST WORD: Roadwork 
251:

Title:  

US 20 interchange with Alpine Road

 
 Volume/Number:  2010 September 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work at the US 20 interchange with Alpine Road at the south edge of Rockford will be begin on Tuesday, September 7, 2010. Rock Road Companies is starting the $78,370 project to improve the two ramps from Alpine Road to US 20. 
 Date Created:  09 01 2010 
 Agency ID:  Nr74-10 
 ISL ID:  000000029091   Original UID: 13547 FIRST WORD: US 
252:

Title:  

US 20 near Cherry Valley

 
 Volume/Number:  2010 September 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on US 20 near Cherry Valley will begin on Tuesday, September 7, 2010. 
 Date Created:  09 01 2010 
 Agency ID:  Nr75-10 
 ISL ID:  000000029092   Original UID: 13548 FIRST WORD: US 
253:

Title:  

US 6 and IL 81

 
 Volume/Number:  2010 September 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that weather permitting, construction work on Osco Road between US 6 and IL 81 will begin on Tuesday, September 7, 2010. 
 Date Created:  09 01 2010 
 Agency ID:  Nr76-10 
 ISL ID:  000000029093   Original UID: 13549 FIRST WORD: US 
254:

Title:  

US 30 bridge over Mississippi River

 
 Volume/Number:  2010 September 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announces today that, weather permitting, construction work on the US 30 bridge over the Mississippi River will begin on Tuesday, September 7, 2010 
 Date Created:  09 01 2010 
 Agency ID:  Nr77-10 
 ISL ID:  000000029094   Original UID: 13550 FIRST WORD: US 
255:

Title:  

IL 1 Resurfacing Belgum to Westville

 
 Volume/Number:  2010 September 1 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that, weather permitting; work is scheduled to begin September 7, 2010 for the resurfacing of IL Route 1/U.S. 150 from Lyons Road in Belgium to the south city limit of Westville in Vermilion county. 
 Date Created:  09 01 2010 
 Agency ID:   
 ISL ID:  000000029095   Original UID: 13552 FIRST WORD: IL 
256:

Title:  

IL 1 Resurfacing Tilton to Danville

 
 Volume/Number:  2010 August 31 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that, weather permitting; work is scheduled to begin September 7, 2010 for the resurfacing of IL Route 1/U.S. 150 from 16th Street in Tilton to Main Street in Danville in Vermilion county. 
 Date Created:  08 31 2010 
 Agency ID:   
 ISL ID:  000000029096   Original UID: 13553 FIRST WORD: IL 
257:

Title:  

McClugage Bridge in Peoria will be closed from Tuesday, September 7th through Friday, September 10th

 
 Volume/Number:  2010 September 3 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation (IDOT) announces that the westbound passing (left) lane of the McClugage Bridge will be closed from Tuesday, September 7th through Friday, September 10th for patching work 
 Date Created:  09 03 2010 
 Agency ID:   
 ISL ID:  000000029098   Original UID: 13555 FIRST WORD: McClugage 
258:

Title:  

Holloway Street will be closed at the CSX Railroad crossing in Bismarck

 
 Volume/Number:  2010 September 3 
 Issuing Agency:   
 Description:  The crossing at railroad mile post 114.23 will be closed for one (1)to two (2) days starting on Tuesday September 7, 2010. The CSX Transportation, Inc. Railroad will be making repairs to the crossing. 
 Date Created:  09 03 2010 
 Agency ID:   
 ISL ID:  000000029099   Original UID: 13556 FIRST WORD: Holloway 
259:

Title:  

Main Street and Bowman Avenue in Danville

 
 Volume/Number:  2010 September 3 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation, Region 3/District 5, has announced that modification of the traffic pattern at the intersection of Main Street (U.S. Route 136) and Bowman Avenue will be done to improve traffic flow 
 Date Created:  09 03 2010 
 Agency ID:   
 ISL ID:  000000029100   Original UID: 13559 FIRST WORD: Main 
260:

Title:  

Illinois 26 will be closed for approximately seven days to allow the IAIS Railroad to repair their crossing.

 
 Volume/Number:  2010 September 7 
 Issuing Agency:   
 Description:  The Illinois Department of Transportation announced today that the Illinois 26-IAIS Railroad grade crossing located approximately one mile south of Bureau Junction will be closed on Monday, September 20, 2010. 
 Date Created:  09 07 2010 
 Agency ID:   
 ISL ID:  000000029103   Original UID: 13561 FIRST WORD: Illinois 
Page: Prev  ...  11 12 13 14 15   ...  Next