| 1: | | Title: | | | | Volume/Number: | 2006 June | | | Issuing Agency: | | | | Description: | A leak from storage tank piping on June 12, 2006 allowed approximately 150,000 gallons of product to fill an earthen reservoir around tanks on the property, and most of it infiltrated the ground. Later, product was found floating on groundwater underneath the site, and field tiles had transported some of the material to a field southeast of the site. Surface water in the area flows west-northwest. Buckeye hired a contractor to clean up product that had flowed to a drainage ditch near a small pond one mile northwest. The contractor used oil booms to contain the spill, skimmed it off the water, and removed it for proper disposal. | | | Date Created: | 05 14 2012 | | | Agency ID: | Fact Sheet #2 | | | ISL ID: | 000000042263 Original UID: 21762 FIRST WORD: Harristown | |
|