|  | | 1: |  | Title:   |  |  |  |  | Volume/Number: |  |  |  |  | Issuing Agency: |  |  |  |  | Description: | This manual has been prepared to train the student to become a Level III Portland Cement Concrete  PCC  Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department,  Quality Control/Quality Assurance  QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. |  |  |  | Date Created: |  |  |  |  | Agency ID: |  |  |  |  | ISL ID: | 000000049703   Original UID:  FIRST WORD: Portland |  | 
 |