Illinois State Library

Electronic Documents of Illinois


Search results for

Search:
Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report in SiteTitle [X]
rss icon RSS
Results:  1 Item
Sorted by:  
Page: 1
SiteTitle
Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report[X]
XMLRecordID
000000041028 (1)
DateCreated
1:

Title:  

Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report

 
 Volume/Number:  2007 July 10 
 Issuing Agency:   
 Description:  The Charleston Side-Channel Reservoir (CSCR) was the subject of a USEPA Clean Lakes Program (314) diagnostic/feasibility report in 1992. This document developed hydrologic, nutrient and sediment budgets for the CSCR. The CSCR has two watersheds: one that flows directly into the reservoir (the immediate watershed) and one whose water is selectively pumped into the reservoir. The immediate watershed was the number one source of sediment loading, third highest for nitrate loading and fourth for phosphorus loading of the reservoir. The largest source of loading for phosphorus was internal phosphorus cycling. Second largest source was from shoreline erosion. In 1996 a large aeration system was installed in order to curtail internal phosphorus loading. In 1994 the first in a series of erosion control projects was started in an effort to reduce erosion related loading. 
 Date Created:  11 06 2007 
 Agency ID:  Financial Assistance Agreement Number 3190321 
 ISL ID:  000000041028   Original UID: 21091 FIRST WORD: Charleston