SiteTitle • | Design and Construction Manual | [X] |
| 1: | | Title: | | | | Volume/Number: | 2002 September | | | Issuing Agency: | | | | Description: | While this version of the A/E contract documents appears quite different from the versions of the past few years, little has actually changed regarding A/E duties and responsibilities. We have consolidated all detailed project phase requirements - from design through closeout - into one manual, so the A/E will have one reference to look to. The legalese, all the things that make a contract, insurance requirements, and a skeleton description of A/E duties and responsibilities are now included in the PSA. The detailed requirements of the old A/E Manual, the Project Manual Workbook, and A/E duties included in Procedures and Forms - Construction Phase are incorporated into this new Design and Construction Manual. | | | Date Created: | 09 2002 | | | Agency ID: | | | | ISL ID: | 000000002840 Original UID: 2557 FIRST WORD: Design | |
2: | | Title: | | | | Volume/Number: | 2006 January | | | Issuing Agency: | | | | Description: | In 2002, the Design and Construction Manual was created so that all project phase requirements - from design through closeout - were included in one manual, so the A/E has only one reference to look to. The legalese, all the things that make a contract, insurance requirements, and a skeleton description of A/E duties and responsibilities are included in the PSA. The detailed requrements of the old A/E Manual, the Project Manual Workbook, and A/E duties included in Procedures and Forms - Constructiion Phase were incorporated into the Design and Construction Manual. There are no major changes to the content of this edition of the DCM. Some changes were made, which reflect administrative and legislative changes, including adoption of current CSI s[ecification section numbering. | | | Date Created: | 09 20 2006 | | | Agency ID: | | | | ISL ID: | 000000047902 Original UID: 169987 FIRST WORD: Design | |
3: | | Title: | | | | Volume/Number: | 2009 | | | Issuing Agency: | | | | Description: | In 2002, the Design and Construction Manual was created so that all project phase requirements - from design through closeout - were included in one manual, so the A/E has one main reference to look to. The legal language, insurance requirements, and a skeleton description of A/E duties and responsibilities are included in the PSA, but the DCM is the working document for A/Es. There are no major changes to the content of this edition of the DCM. Some changes, reflecting adminisgrative and legislative changes, were made in this edition. | | | Date Created: | 03 13 2009 | | | Agency ID: | | | | ISL ID: | 000000047952 Original UID: 170040 FIRST WORD: Design | |
|