SiteTitle • | Bridge Deck Patching at Interstate 55 and U.S. 41 | [X] |
Organization • | Illinois Department of Transportation | [X] |
| 1: | | Title: | | | | Volume/Number: | 2012 April 13 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation (IDOT) announced that bridge deck patching at the Interstate 55 (Stevenson Expressway) interchange with U.S. 41 (Lake Shore Drive) will require weekday lane closures starting the week of April 16. | | | Date Created: | 04 13 2012 | | | Agency ID: | | | | ISL ID: | 000000042740 Original UID: 22265 FIRST WORD: Bridge | |
2: | | Title: | | | | Volume/Number: | 2012 | | | Issuing Agency: | | | | Description: | As part of the bridge substructure repair, the right two lanes (lanes 2 and 3) of northbound I-55 will be closed at King Drive, weather permitting, from 12:01 a.m. to 5 a.m. Thursday. The ramp from northbound I-55 to southbound Lake Shore Drive will need to be closed from 12:01 a.m. to 5 a.m. Thursday. A detour route will be posted directing traffic to northbound Lake Shore Drive and the 18th Street exit, and entrance ramps to access southbound Lake Shore Drive. The State Street entrance ramp to Northbound I-55 will need to be closed 12:01 a.m. to 5 a.m. A detour route will be posted directing traffic to 31st Street and Lake Shore Drive. | | | Date Created: | 07 03 2012 | | | Agency ID: | | | | ISL ID: | 000000045136 Original UID: 24568 FIRST WORD: Bridge | |
|