SiteTitle • | 2001 305(b) Summary Report (1999 data) Inland Lakes |
(1)
| • | 2008 Final Federal CAFO Rule Frequently Asked Questions |
(1)
| • | 2008 Groundwater Protection Policy Forum: Groundwater Degradation and Sustainability, Pere Marquette, Peoria, IL, September 24th, 2008 |
(1)
| • | Altamont New Reservoir TMDL Report |
(1)
| • | Appendices to Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report |
(1)
| • | Aquatic Exotics |
(1)
| • | Aquatic Plant Management Options |
(1)
| • | Arsenic in Illinois Groundwater |
(1)
| • | Artificial Structures for Fish Cover |
(1)
| • | Ashland New Lake Watersheds TMDL Stage Three Draft Report |
(1)
| • | Ashland New Reservoir Watershed TMDL Stage One Draft Report |
(1)
| • | Ashland New Reservoir watershed TMDL report |
(1)
| • | Assessment of Total Chromium in Illinois Community Water Supplies |
(1)
| • | Baseline Loadings of Nitrogen, Phosphorus, and Sediments from Illinois Watersheds |
(1)
| • | Bay Creek Watershed TMDL Report |
(1)
| • | Bay Creek Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Bay Creek Watershed TMDL Stage Three Report |
(1)
| • | Beaucoup Creek TMDL Report |
(1)
| • | Beavers and Muskrats |
(1)
| • | Big Muddy River TMDL Report |
(1)
| • | Bonnie Creek TMDL Report |
(1)
| • | Bonpas Creek Watershed Total Maximum Daily Load: Stage 1 Report, Draft |
(1)
| • | Cahokia Canal Watershed TMDL Report |
(1)
| • | Cahokia Canal/Horseshoe Lake Watershed TMDL: Stage One [Third Quarter Draft Report] |
(1)
| • | Cahokia Canal/Horseshoe Lake Watershed Total Maximum daily Load Stage Three Report |
(1)
| • | Cahokia Creek/Holiday Shores Lake Watershed TMDL: Stage One Third Quarter Draft Report |
(1)
| • | Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report |
(1)
| • | Cahokia Creek/Holiday Shores Lake watershed TMDL Report |
(1)
| • | Canada Geese and Your Lake |
(1)
| • | Canton Lake TMDL Development Stage 1 Report: Final |
(1)
| • | Capacity Development Strategy for Existing Public Water Supplies, July 2000 |
(1)
| • | Casey Fork TMDL Report |
(1)
| • | Cedar Creek TMDL Report |
(1)
| • | Cedar Creek Watershed TMDL Report |
(1)
| • | Cedar Creek/Cedar Lake TMDL Implementation Plan: Public Review Draft Report |
(2)
| • | Cedar Creek/Cedar Lake Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Charleston Side Channel Reservoir Restoration Plan: Clean Lake Program Phase 1 Diagnostic Feasibility Study |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #1 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #2 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #3 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #4 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #5 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #6 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report #7 |
(1)
| • | Charleston Side Channel Reservoir TMDL: Progress Report ... |
(1)
| • | Charleston Side Channel Reservoir Total Maximum Daily Load Report: Coles County, Illinois |
(1)
| • | Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report |
(1)
| • | Chicago Botanic Garden Lakes: Illinois Clean Lakes Program Phase 2 Final Report |
(1)
| • | Chloride Usage Education and Reduction Program Study: Final Report |
(1)
| • | Chromium-6 Strategic Plan |
(1)
| • | Clean Water Action Plan: Restoring and Protecting America's Waters: Unified Watershed Assessment and Watershed Restoration Priorities for Illinois |
(1)
| • | Common Lake Water Quality Parameters |
(1)
| • | Condition of Illinois Water Resources |
(2)
| • | Consumer Confidence Report Guidance Manual |
(1)
| • | Countryside Lake Water Quality Monitoring Program: Final Report |
(1)
| • | Crab Orchard Creek Watershed TMDL Implementation Plan: Public Review Draft Report |
(1)
| • | Crab Orchard Creek Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Crab Orchard Watershed TMDL Report |
(1)
| • | Crooked Creek Watershed TMDL Implementation Plan: Draft Report |
(1)
| • | Crooked Creek Watershed TMDL Report |
(1)
| • | Crooked Creek Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Des Plaines River/Higgins Creek Watershed TMDL Report |
(1)
| • | Des Plaines River/Higgins Creek Watershed TMDL Report: Draft |
(1)
| • | Des Plaines River/Higgins Creek Watershed TMDL Stage 1 Report |
(1)
| • | Determining Your Lake's Watershed |
(1)
| • | Digester/Over the Spillway |
(29)
| • | DuPage River and Salt Creek TMDL - Stage 2 Development of Septic System Map for Targeted Subbasin: Final Report |
(1)
| • | DuPage River/Salt Creek Watershed TMDL Stage 1 Report |
(1)
| • | DuPage River/Salt Creek Watershed TMDL Stage 1 Report and Stage 2 TMDL - Sediment Oxygen Demand Monitoring |
(1)
| • | Dutchman Creek TMDL Report |
(1)
| • | East Fork Kaskaskia River TMDL Report |
(1)
| • | East Fork Kaskaskia River/Farina Lake Watershed Simazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | East Fork Kaskaskia Watershed TMDL River |
(1)
| • | East Fork LaMoine River Watershed TMDL Report |
(1)
| • | East Fork LaMoine River/Spring Lake Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Evergreen Lake Watershed Plan |
(1)
| • | Evergreen Lake watershed TMDL report |
(1)
| • | Facility Planning Area Research: Final Program Evaluation |
(2)
| • | Fecal Coliform TMDL Development for the Little Vermilion River, Illinois: Public Review Draft Report |
(2)
| • | Fertilizers and Pesticides: Options for Lawn and Garden Use |
(1)
| • | Final Approved Stage Three Report TMDLs for Target Watersheds: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) Stream Segments IL_OK-01 and IL-OK-02 |
(1)
| • | First Quarterly Progress Report: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) |
(1)
| • | Framework for a Basinwide Planning and Protection Pilot |
(1)
| • | Galena/Sinsinawa Rivers Watershed TMDL Stage 1 Report: Draft Report for Public Review |
(1)
| • | Georgetown Lake TMDL Implementation Plan: Public Review Draft Report |
(1)
| • | Glenn Shoals-Hillsboro Watershed TMDL Report |
(1)
| • | Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): ... Quarterly Progress Report [includes First, Second, and Third Quarterly Reports] |
(1)
| • | Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Draft TMDL |
(1)
| • | Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Final Stage 1 Progress Report |
(1)
| • | Governor Bond Lake Greenville, Illinois Total Maximum Daily Loads |
(1)
| • | Governor Bond TMDL Report |
(1)
| • | Greenville Lake and Coffeen Lake TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, And Methodology selection |
(1)
| • | Greenville Old Lake and Coffeen Lake Watersheds |
(1)
| • | Guidance Document for Groundwater Protection Needs Assessments |
(1)
| • | Guidance for Developing Watershed Action Plans in Illinois |
(1)
| • | Highland Silver Lake Watershed (ROZA): ... Quarterly Progress Report [includes First, Second and Third Quarterly Reports] |
(1)
| • | Highland Silver Lake Watershed (ROZA): Draft TMDL |
(1)
| • | Highland Silver Lake Watershed (ROZA): Final Stage 1 Progress Report |
(1)
| • | Highland Silver Lake Watershed TMDL Report |
(1)
| • | Hobson Creek Corridor Restoration Project, Phase 1: Tributary 6 to the East Branch DuPage River: Section 319 Project Report |
(1)
| • | Hobson Creek Corridor Restoration Project, Phase 2: Tributary 6 to the East Branch DuPage River: Section 319 Project Report |
(1)
| • | Hobson Creek Corridor Restoration Project, Phase 3: Tributary 6 to the East Branch DuPage River: Section 319 Project Report |
(1)
| • | Hodges Creek TMDL [Stage 3 Draft] |
(1)
| • | Hodges Creek Watershed Final Stage 1 Progress Report |
(1)
| • | Hodges Creek Watershed: Otter Lake (RDF), Palmyra-Modesto Lake (RDZP), Hettick Lake (SDZF): Draft TMDL |
(1)
| • | Hodges Creek watershed TMDL report |
(1)
| • | Home and Yard |
(1)
| • | Homer Lake Watershed TMDL report |
(1)
| • | Horseshoe Lake (Alexander County) Watershed TMDL Report |
(1)
| • | Horseshoe Lake Watershed Total Maximum Daily Load: Stage 1 Report, Draft |
(1)
| • | Illinois 2002 Section 303(d) List |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, October 1, 2010 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2005 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2006 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2007 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2009 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2012 |
(1)
| • | Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2013 |
(1)
| • | Illinois Benthic Macroinvertebrate Collection Method Comparison and Stream Condition Index Revision [2004: rev 2007] |
(1)
| • | Illinois Clean Lakes Program |
(1)
| • | Illinois EPA Ambient Groundwater Monitoring Network Factsheet |
(1)
| • | Illinois EPA Clean Lakes Program: Clean Lakes Study Review and Implementation Report for Lake Hillsboro, Montgomery County, Illinois |
(1)
| • | Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Cedar Lake and Carbondale Reservoir, Carbondale, IL (Final Report - January 2009) |
(1)
| • | Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Highland Silver Lake, Highland, IL: Final Report |
(1)
| • | Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Kinkaid Lake, Jackson County, IL (Final Report - September 2006) |
(1)
| • | Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Lake Vermilion, Vermilion County, IL: final draft submittal |
(1)
| • | Illinois EPA Clean Lakes Program: Phase I Diagnostic / Feasibility Study of Campus Lake, Southern Illinois University, Carbondale, Jackson County, Illinois |
(1)
| • | Illinois EPA Livestock Program 1999 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2000 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2001 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2002 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2003 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2004 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2005 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2006 livestock facility investigation annual report |
(2)
| • | Illinois EPA Livestock Program 2007 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2008 livestock facility investigation annual report |
(1)
| • | Illinois EPA Livestock Program 2010 Livestock Facility Investigation Annual Report |
(1)
| • | Illinois EPA Livestock Program 2011 Livestock Facility Investigation Annual Report |
(1)
| • | Illinois EPA's Ash Impoundment Strategy Progress Report |
(4)
| • | Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Glenn Shoals Lake, City of Hillsboro, Montgomery County, Illinois |
(1)
| • | Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Governor Bond Lake, City of Greenville, Bond County, Illinois |
(1)
| • | Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Staunton Lake, City of Staunton, Macoupin County, Illinois |
(1)
| • | Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic and Feasibility Study, Patriots Park Lake, Kingsbury Park District, Bond County, Illinois |
(1)
| • | Illinois Groundwater Protection Program: A Biennial Report |
(2)
| • | Illinois Groundwater Protection Program: Biennial Comprehensive status and self-assessment report |
(1)
| • | Illinois Groundwater Protection Program: Biennial Status and Self-Assessment Report |
(1)
| • | Illinois Groundwater Protection Program: Biennial comprehensive status and self-assessment report, Executive Summary |
(1)
| • | Illinois Groundwater Protection Program: Biennial policy report |
(1)
| • | Illinois Groundwater Protection Program: volume 1: Biennial Policy Report |
(1)
| • | Illinois Groundwater Protection Program: volume II: biennial program report |
(1)
| • | Illinois Groundwater Protection Program: volume III: biennial technical appendices report |
(1)
| • | Illinois Integrated Water Quality Report and Section 303(d) List |
(1)
| • | Illinois Lake Michigan (nearshore) Toxics TMDL Scoping Report |
(1)
| • | Illinois Lakeshore Birds |
(1)
| • | Illinois Public Water Supply Emergency Procedures Quick Reference Guide |
(1)
| • | Illinois River (Peoria Area) TMDL and LRS Development: Watershed Characterization and Source Assessment Report (Stage 1) [review draft] |
(2)
| • | Illinois Volunteer Lake Monitoring Program (VLMP) |
(1)
| • | Illinois Volunteer Lake Monitoring Program Newsletter |
(8)
| • | Illinois Volunteer Lake Monitoring Program Newsletter: |
(1)
| • | Illinois Water Monitoring Strategy, 2007-2012 |
(1)
| • | Illinois Water Pollution Control Loan Program,Annual Report, FY ... |
(1)
| • | Illinois Water Pollution Control Loan Program,Annual Report, [FY 2007] |
(1)
| • | Illinois Water Quality Report |
(2)
| • | Illinois' Nonpoint Source Management Program |
(2)
| • | Kickapoo Creek Project - Phase I: IEPA 319 Grant: Final Report |
(1)
| • | Kinkaid Lake TMDL Best Management Practices Implementation: Project Evaluation and Final Report |
(1)
| • | Lake Beat |
(2)
| • | Lake Bloomington TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection |
(1)
| • | Lake Bloomington TMDL: Final Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection |
(1)
| • | Lake Bloomington Watershed Plan |
(1)
| • | Lake Bloomington Watershed TMDL Implementation Plan: Public Review Draft |
(1)
| • | Lake Bloomington Watershed TMDL Report |
(1)
| • | Lake Bloomington Watershed TMDL Stage 3 Public Draft Report |
(1)
| • | Lake Carlinville Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Lake Dredging |
(1)
| • | Lake Education Assistance Program (LEAP) |
(1)
| • | Lake Glenn Shoals/Hillsboro Old Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Lake Mattoon and Lake Paradise Simazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Lake Michigan Beaches TMDL Stage-One Responsiveness Summary |
(1)
| • | Lake Oakland TMDL Implementation Plan: Public Review Draft Report |
(2)
| • | Lake Oakland Watershed TMDL Report |
(1)
| • | Lake Springfield Watershed TMDL Stage 1 Report: Draft Report |
(1)
| • | Lake Stratification and Mixing |
(1)
| • | Little Muddy River TMDL Report |
(2)
| • | Little Vermilion River Fecal Coliform TMDL Implementation Plan: Public Review Draft Report |
(1)
| • | Little Wabash II Watershed TMDL Report |
(1)
| • | Little Wabash River I Watershed TMDL Implementation Plan: Public Review Draft Report |
(1)
| • | Little Wabash River II Watershed TMDL Implementation Plan: Public Review Draft |
(1)
| • | Little Wabash River TMDL: Stage 1 Public Draft Report |
(1)
| • | Little Wabash River Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Little Wabash River Watershed: Stage 2 Data Report |
(2)
| • | Little Wabash Watershed: Final Stage 1 Progress Report |
(1)
| • | Load Reduction Strategy and TMDL Draft: Indian Creek, Dago Slough and Prairie Creek |
(1)
| • | Lower Kaskaskia River Watershed TMDL Report |
(1)
| • | Lower Kaskaskia River Watershed TMDL Stage One: Final Report |
(2)
| • | Lyman Woods Streambank Stabilization PSA 2, Phases 1 and 2: Tributary to the East Branch DuPage River: Section 319 Project Report |
(1)
| • | Macoupin Creek Watershed Draft TMDL |
(1)
| • | Macoupin Creek Watershed TMDL Report |
(1)
| • | Maple Lake Rehabilitation and Protection Program: Phase 2 Implementation Project Report [at head of title: Illinois Clean Lakes Program] |
(1)
| • | Mary's River/North Fork Cox Creek TMDL Implementation Plan: Public Review Draft Report |
(1)
| • | Mary's River/North Fork Cox Creek Watershed TMDL Report |
(1)
| • | Mary's River/North Fork Cox Creek Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Mauvaise Terre Creek Watershed Final Approved TMDL |
(1)
| • | Mauvaise Terre Creek Watershed TMDL Report |
(2)
| • | Mauvaise Terre Creek Watershed TMDL: January 2011 Revision |
(1)
| • | Mauvaise Terre Creek Watershed: Final Stage 1 Progress Report |
(1)
| • | Maximum Setback Zone Workbook |
(1)
| • | McCullom Lake Evaluation Report |
(1)
| • | Methyl Tertiary Butyl Ether (MTBE) in Illinois |
(1)
| • | Middle Fork Saline River Watershed TMDL Stage One: Final Report |
(2)
| • | Middle Fork Saline River Watershed TMDL Stage Three Draft Report |
(1)
| • | Middle Illinois River Total Maximum Daily Load and Load Reduction Strategies: Draft |
(1)
| • | Middle Illinois River Total Maximum Daily Load and Load Reduction Strategies: Final TMDL |
(1)
| • | Middle Saline River Watershed TMDL Report |
(1)
| • | Milfoil Weevil |
(1)
| • | Monitoring Lake Quality |
(1)
| • | Mt. Olive New Lake, Mt. Olive Old Lake and Staunton Lake Watersheds TMDL Report |
(1)
| • | Nashville City Reservoir and Washington County Lake Atrazine and Simazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | North Fork Kaskaskia River Watershed Final Approved TMDL |
(1)
| • | North Fork Kaskaskia River Watershed TMDL Report |
(1)
| • | North Fork Kaskaskia River Watershed: ... Quarterly Progress Report [includes First, Second and Third Quarters] |
(1)
| • | North Fork Mauvaise Terre Creek Watershed Draft Stage 3 Report |
(1)
| • | North Fork Vermilion River Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | North Fork Vermilion River Watershed TMDL Implementation Plan: Public Review Draft Report |
(2)
| • | North Fork Vermilion River and Lake Vermilion TMDL Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology selection |
(2)
| • | North Fork Vermilion River and Lake Vermilion TMDL: Draft Stage 3 Report |
(1)
| • | Other Coal Ash Sites |
(1)
| • | Otter Lake Shoreline Erosion Control Project |
(1)
| • | Part 2: Lake and Watershed Management Plan, Carlinville, Macoupin County, Illinois |
(1)
| • | Pecatonica River Total Maximum Daily Load and Load Reduction Strategies: Stage 1 Report |
(1)
| • | Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois |
(1)
| • | Phase II Implementation Report for Campus Lake, Jackson County, Illinois |
(1)
| • | Phosphorus: A Summary of Information Regarding Lake Water Quality |
(1)
| • | Prairie Creek / Langan Creek Watershed Total Maximum Daily Load Stage One Report |
(1)
| • | Prairie Creek Watershed TMDL Report |
(1)
| • | Pressure-Treated Wood |
(1)
| • | Primer Regarding Certain Provisions of the Illinois Groundwater Protection Act |
(1)
| • | Public Water Supply Loan Program (PWSLP) |
(1)
| • | Public Water Supply Loan Program Annual Report, FY ... . |
(1)
| • | Public Water Supply Loan Program Annual Report, [FY 2007] |
(1)
| • | Quality Assurance and Field Methods Manual |
(1)
| • | Quarterly Report 1 (July-September 2001): West Branch DuPage River Watershed |
(1)
| • | Quarterly Report 1: Beaucoup Creek Watershed |
(1)
| • | Quarterly Report 1: Big Muddy River #1 Watershed |
(1)
| • | Quarterly Report 1: Big Muddy River #2 Watershed |
(1)
| • | Quarterly Report 1: Bonnie Creek Watershed |
(1)
| • | Quarterly Report 1: Casey Fork Watershed |
(1)
| • | Quarterly Report 1: Little Muddy River Watershed |
(1)
| • | Quarterly Report 1: Little Wabash River Watershed |
(1)
| • | Quarterly Report 1: Vandalia Lake Watershed |
(1)
| • | Quarterly Report 2 (October-December 2001): West Branch DuPage River Watershed |
(1)
| • | Quarterly Report 2: Beaucoup Creek Watershed |
(1)
| • | Quarterly Report 2: Big Muddy River #1 Watershed |
(1)
| • | Quarterly Report 2: Big Muddy River #2 Watershed |
(1)
| • | Quarterly Report 2: Bonnie Creek Watershed |
(1)
| • | Quarterly Report 2: Casey Fork Watershed |
(1)
| • | Quarterly Report 2: Dutchman Creek Watershed |
(1)
| • | Quarterly Report 2: Little Muddy River Watershed |
(1)
| • | Quarterly Report 2: Little Wabash River Watershed |
(1)
| • | Quarterly Report 2: Vandalia Lake Watershed |
(1)
| • | Quarterly Report 3 (January-March 2002): West Branch DuPage River Watershed |
(1)
| • | Quarterly Report 3: Beaucoup Creek Watershed |
(1)
| • | Quarterly Report 3: Big Muddy River #1 Watershed |
(1)
| • | Quarterly Report 3: Big Muddy River #2 Watershed |
(1)
| • | Quarterly Report 3: Bonnie Creek Watershed |
(1)
| • | Quarterly Report 3: Casey Fork Watershed |
(1)
| • | Quarterly Report 3: Dutchman Creek Watershed |
(1)
| • | Quarterly Report 3: Little Muddy River Watershed |
(1)
| • | Quarterly Report 3: Little Wabash River Watershed |
(1)
| • | Quarterly Report 3: Vandalia Lake Watershed |
(1)
| • | Quarterly Report 4 (April-June 2002): West Branch DuPage River Watershed |
(1)
| • | Quarterly Report 4: Beaucoup Creek Watershed |
(1)
| • | Quarterly Report 4: Big Muddy River #1 Watershed |
(1)
| • | Quarterly Report 4: Big Muddy River #2 Watershed |
(1)
| • | Quarterly Report 4: Bonnie Creek Watershed |
(1)
| • | Quarterly Report 4: Casey Fork Watershed |
(1)
| • | Quarterly Report 4: Dutchman Creek Watershed |
(1)
| • | Quarterly Report 4: Little Muddy River Watershed |
(1)
| • | Quarterly Report 4: Little Wabash River Watershed |
(1)
| • | Quarterly Report 4: Vandalia Lake Watershed |
(1)
| • | Quarterly Report Dutchman Creek Watershed |
(2)
| • | Quarterly Report: Beaucoup Creek Watershed |
(1)
| • | Quarterly Report: Big Muddy River #1 Watershed |
(1)
| • | Quarterly Report: Big Muddy River #2 Watershed |
(1)
| • | Quarterly Report: Bonnie Creek Watershed |
(1)
| • | Quarterly Report: Casey Fork Watershed |
(1)
| • | Quarterly Report: Little Muddy River Watershed |
(1)
| • | Quarterly Report: Little Wabash River Watershed |
(1)
| • | Quarterly Report: Vandalia Lake Watershed |
(1)
| • | Quarterly Report: West Branch DuPage River Watershed |
(1)
| • | Rayse Creek (ILNK01) TMDL and Implementation Plan |
(1)
| • | Rayse Creek Watershed Management Plan |
(1)
| • | Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 1 Report: Watershed Characterization and Water Quality Analysis |
(1)
| • | Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 3 Final Report |
(1)
| • | Rend Lake Watershed TMDL Stage 1 Report: Draft Report |
(1)
| • | Report to Governor: Capacity Development Program, 2002 |
(1)
| • | Report to Governor: Capacity Development Program: September 30, 2005 |
(1)
| • | Reporting Requirements for Livestock Waste Releases in Illinois |
(1)
| • | Restoring Illinois Water Quality with TMDLs |
(1)
| • | Rock River Basin Assessment: An Overview of the Rock River Watersheds in Illinois |
(1)
| • | Salem City Reservoir Simazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Salt Fork Vermilion River Watershed TMDL Report |
(1)
| • | Sample Collector's Handbook |
(1)
| • | Sangamon River/Lake Decatur Watershed TMDL Report |
(1)
| • | Sangamon River/Lake Decatur Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Sediment Classification for Illinois Inland Lakes: 1996 Update |
(1)
| • | Septic Systems |
(1)
| • | Shoal Creek Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Shoal Creek Watershed TMDL Implementation Plan: Public Review Draft Report |
(2)
| • | Shoal Creek Watershed TMDL Report |
(1)
| • | Shoal Creek Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | Shoreline Buffer Strips |
(1)
| • | Shoreline Stabilization: Bioengineering Alternatives |
(1)
| • | Skillet Fork Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Skillet Fork Watershed TMDL Report |
(1)
| • | Skillet Fork Watershed TMDL [Stage 3] |
(1)
| • | Skillet Fork Watershed: Final Stage 1 Progress Report |
(1)
| • | South Fork Saline - Lake Egypt Watershed TMDL Report |
(1)
| • | South Fork Saline River/Lake of Egypt Implementation Plan: Draft Report |
(1)
| • | South Fork Saline River/Lake of Egypt Watershed TMDL Stage One Third Quarter Draft Report |
(1)
| • | South Fork Sangamon River/Lake Taylorville Watershed TMDL Report |
(1)
| • | Spring Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report |
(1)
| • | Stage 2 - Water Quality Sampling Report for TMDLs in North Fork Vermilion River, Salt Fork Vermilion River, Sugar Creek, and Walnut Point Lake: Final Report |
(1)
| • | Stage 2 Data Report: Final Report |
(1)
| • | Stage 2 Report for TMDL Sampling Activities in the Upper Big Muddy River Watershed, Illinois |
(1)
| • | State of Illinois Public Water Supply Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan |
(1)
| • | State of Illinois Section 319 - Biannual Report |
(9)
| • | State of Illinois Section 319 - Biannual Report: March 2003 |
(1)
| • | State of Illinois Section 319 - Biannual Report: March 2006 |
(2)
| • | State of Illinois Section 319 - Biannual Report: March 2007 |
(1)
| • | State of Illinois Section 319 - Biannual Report: March 2009 |
(1)
| • | State of Illinois Section 319 - Biannual Report: March 2010 |
(1)
| • | State of Illinois Section 319 - Biannual Report: September 2001 |
(2)
| • | State of Illinois Section 319 - Biannual Report: September 2002 |
(1)
| • | State of Illinois Section 319 - Biannual Report: September 2004 |
(1)
| • | State of Illinois Section 319 - Biannual Report: September 2005 |
(2)
| • | State of Illinois Section 319 Biannual Report |
(2)
| • | State of Illinois Section 319 Biannual Report: March 2012 |
(1)
| • | State of Illinois Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan |
(1)
| • | Stormwater Detention Ponds |
(1)
| • | Stream Dissolved Oxygen Improvement Feasibility Study for Salt Creek: Final Report |
(1)
| • | Stream Dissolved Oxygen Improvement Feasibility Study for the East Branch of the DuPage River: Final Report |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Pilot |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2007-2008 |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2009-2010 |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year ... |
(1)
| • | Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year 2003-2006 |
(1)
| • | Sugar Creek / Lake Branch Watershed TMDL Report |
(1)
| • | Sugar Creek Watershed TMDL Report |
(1)
| • | Sugar Creek Watershed TMDL Stage One: Final Report |
(1)
| • | Sugar Creek and Vermont City Reservoir TMDL Development Stage 1 Report: Final |
(1)
| • | Surface Discharging Private Sewage Disposal Systems (Commonly Referred to as Septic Systems) and Their Effects on Communities in Illinois |
(1)
| • | TMDL Development for Bonpas Creek Watershed |
(1)
| • | TMDL Development for Evergreen Lake: Quarterly Report |
(1)
| • | TMDL Development for Evergreen Lake: Quarterly Report #1 |
(1)
| • | TMDL Development for Galena/Sinsinawa Rivers Watershed |
(1)
| • | TMDL Development for Homer Lake in the Salt Fork Vermilion River Watershed, Illinois: Stage Three Report: TMDL Development |
(1)
| • | TMDL Development for Horseshoe Lake Watershed |
(1)
| • | TMDL Development for Lake Canton Watershed |
(1)
| • | TMDL Development for Lake Michigan Beaches |
(1)
| • | TMDL Development for Lake Springfield Watershed |
(1)
| • | TMDL Development for Ohio River Watershed |
(1)
| • | TMDL Development for Pecatonica River Watershed |
(1)
| • | TMDL Development for Prairie Creek/Langan Creek Watershed |
(1)
| • | TMDL Development for Rend Lake Watershed |
(1)
| • | TMDL Development for Upper Big Muddy River Watershed |
(1)
| • | TMDL Development for Vermont City Reservoir/Sugar Creek Watershed |
(1)
| • | TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review |
(1)
| • | TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft |
(1)
| • | TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft |
(1)
| • | TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Final Report: Stage One Report: Watershed Characterization and Water Quality Analysis |
(2)
| • | TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Public Review Draft Report: Stage Three Report: Lake Oakland TMDL Development |
(1)
| • | TMDL Development for the Little Vermilion River Watershed: Final Report |
(2)
| • | TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review |
(1)
| • | TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft |
(1)
| • | TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis |
(2)
| • | TMDL Development for the Salt Fork Vermilion River Watershed: Stage One Report: Watershed Characterization and Water Quality Analysis |
(1)
| • | TMDL Development for the Shoal Creek Watershed, Illinois: Draft Report for Public Review |
(1)
| • | TMDL Development for the South Fork Saline River/Lake of Egypt Watershed, Illinois: Public Review Draft Report |
(1)
| • | TMDL Scoping Report Development for Lake Michigan (nearshore) Mercury and Polychlorinated Biphenyls |
(1)
| • | TMDL and LRS Development for Middle Illinois River Watershed |
(1)
| • | Tampier Lake/Saganashkee Slough Watersheds Stage One TMDL Draft Report |
(1)
| • | Tampier Lake/Saganashkee Slough Watersheds Stage Three TMDL Draft Report |
(1)
| • | Tampier Lake/Saganashkee Slough Watersheds TMDL Report |
(1)
| • | The Condition of Illinois Water Resources |
(1)
| • | Thorn Creek Watershed Based Plan |
(1)
| • | Thorn Creek Watershed TMDL Stage 1 Report |
(1)
| • | Total Maximum Daily Load Development for Altamont New Reservoir Watershed |
(1)
| • | Total Maximum Daily Load Development for Beaucoup Creek Watershed |
(1)
| • | Total Maximum Daily Load Development for Big Muddy River #1 Watershed |
(1)
| • | Total Maximum Daily Load Development for Bonnie Creek Watershed |
(1)
| • | Total Maximum Daily Load Development for Casey Fork Watershed |
(1)
| • | Total Maximum Daily Load Development for Dutchman Creek Watershed |
(1)
| • | Total Maximum Daily Load Development for Fox River |
(2)
| • | Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report |
(1)
| • | Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report |
(1)
| • | Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report |
(2)
| • | Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report |
(1)
| • | Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final |
(1)
| • | Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach |
(1)
| • | Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach |
(1)
| • | Total Maximum Daily Loads for Salt Creek, Illinois: Final Report |
(1)
| • | Total Maximum Daily Loads for West Branch DuPage River, Illinois |
(2)
| • | Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois |
(1)
| • | Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach |
(1)
| • | Triennial Capacity Development Report |
(1)
| • | Triennial Capacity Development Report, 2011 |
(1)
| • | Triennial Capacity Development Report: Safe Drinking Water: Leveraging Resources and Planning for the Future, 2008 |
(1)
| • | Up-dating the LaMoine River Watershed Implementation Plan |
(1)
| • | Upper Big Muddy Watershed Total Maximum Daily Load Stage One Report |
(1)
| • | Upper Fox River/Chain O' Lakes Watershed TMDL Final Stage 1 Report |
(1)
| • | Upper Fox River/Flint Creek Watershed TMDL Final Stage 1 Report |
(1)
| • | Upper North Branch Chicago River Watershed TMDL Stage 1 Report |
(1)
| • | Utilizing Exception Criteria to Avoid Boil Orders after Pressure Loss |
(1)
| • | Vandalia Lake TMDL Report |
(1)
| • | Vermilion River Watershed (IL Basin) TMDL Report |
(1)
| • | Vermilion River Watershed (Illinois Basin) TMDL for Nitrates and Bacteria: Stage 1 Report |
(1)
| • | Villa Park Police Station Urban BMP Demonstration Project: A Project to Demonstrate Integration of Green Roof, Permeable Paving, and Bioswale Urban Runoff Systems |
(1)
| • | Wabash River Nutrient and Pathogen TMDL Development: Final Report |
(1)
| • | Wabash River Watershed TMDL Report |
(1)
| • | Walnut Point Lake Watershed TMDL Report |
(1)
| • | Walnut Point Lake Watershed Total Maximum Daily Load Stage Three Report |
(1)
| • | Water Monitoring Strategy |
(1)
| • | Water Pollution Control Loan Program (WPCLP) |
(1)
| • | Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan |
(1)
| • | Waterborne Pathogens |
(1)
| • | Watershed Implementation Plan for Lake Vermilion and the North Fork Vermilion River, Vermilion County, Illinois |
(1)
| • | Watershed Plan and Diagnostic/Feasibility Study of Lake Carlinville, Macoupin County, Illinois |
(1)
| • | Watershed Plan and Phase 1 Diagnostic/Feasibility Study of Lake Carlinville, Macoupin County, Illinois |
(1)
| • | Where to Go for Lake Information |
(1)
| • | Zebra Mussels |
(1)
|
Organization • | Illinois Environmental Protection Agency, Bureau of Water | [X] |
| 401: | | Title: | | | | Volume/Number: | 2005 April 8 | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 04 28 2005 | | | Agency ID: | | | | ISL ID: | 000000043291 Original UID: 22796 FIRST WORD: TMDL | |
402: | | Title: | | | | Volume/Number: | 2007 July | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 3 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 07 25 2007 | | | Agency ID: | | | | ISL ID: | 000000043292 Original UID: 22797 FIRST WORD: Walnut | |
403: | | Title: | | | | Volume/Number: | 1998 September | | | Issuing Agency: | | | | Description: | The unified watershed assessments provide the foundation for this cooperative approach to restoring and protecting water quality, and support the setting of watershed restoration priorities. The objective of the unified watershed assessments is to combine assessments and build on current, cooperative efforts to identify common priorities - not to create a new activity that competes with existing processes. As indicated in the Clean Water Action Plan, draft watershed assessments and draft watershed restoration priorities are to be scheduled for public comment by August 1, 1998, and final assessments and final watershed restoration priorities are scheduled to be completed by October 1, 1998. | | | Date Created: | 03 12 1999 | | | Agency ID: | | | | ISL ID: | 000000043293 Original UID: 22798 FIRST WORD: Clean | |
404: | | Title: | | | | Volume/Number: | 2004 | | | Issuing Agency: | | | | Description: | The counsel contained in this report will contribute to the development of an important new pilot program. This pilot program will test methods for approaching water resource management in a holistic sense and offers the promise of improvements in water quality planning and protection across Illinois for generations to come. The pilot program will be grounded in sound science, common sense, and an appreciation for the cause and effect relationships that exist at the nexus of economics, environment, and politics. | | | Date Created: | 05 30 2004 | | | Agency ID: | | | | ISL ID: | 000000043294 Original UID: 22800 FIRST WORD: Framework | |
405: | | Title: | | | | Volume/Number: | 2003 July 7 | | | Issuing Agency: | | | | Description: | This program evaluation recounts where the various interest groups seem to be with regard to the FPA process. Taking that in conjunction with the state-by-state review, we developed our best counsel for constructing a road map for IEPA. A road map that will help move the state away from what is commonly regarded as a dysfunctional program and toward something that better protects and preserves water quality throughout the state. | | | Date Created: | 07 10 2003 | | | Agency ID: | | | | ISL ID: | 000000043295 Original UID: 22801 FIRST WORD: Facility | |
406: | | Title: | | | | Volume/Number: | 2003 July 7 | | | Issuing Agency: | | | | Description: | This program evaluation recounts where the various interest groups seem to be with regard to the FPA process. Taking that in conjunction with the state-by-state review, we developed our best counsel for constructing a road map for IEPA. A road map that will help move the state away from what is commonly regarded as a dysfunctional program and toward something that better protects and preserves water quality throughout the state. | | | Date Created: | 07 10 2003 | | | Agency ID: | | | | ISL ID: | 000000043296 Original UID: 22801 FIRST WORD: Facility | |
407: | | Title: | | | | Volume/Number: | 2006 March | | | Issuing Agency: | | | | Description: | The river basin assessment as described in the framework is intended to be a snapshot view of the areas water resources which compiles a variety of information and assessments. It is not a list of public policy recommendations or an implementation document. Rather, it is intended that the river basin assessment will provide the basic information regarding water resources, such as which waters are impaired as well as causes and sources of impairments, that can be used by local planning groups in the development of detailed watershed implementation plans. The Rock River Basin Assessment which follows is the first pilot attempt at such an assessment. | | | Date Created: | 08 07 2006 | | | Agency ID: | | | | ISL ID: | 000000043297 Original UID: 22802 FIRST WORD: Rock | |
408: | | Title: | | | | Volume/Number: | 2009 July | | | Issuing Agency: | | | | Description: | This fact sheet provides basic information about the SCALE program. | | | Date Created: | 07 08 2009 | | | Agency ID: | | | | ISL ID: | 000000043300 Original UID: 22804 FIRST WORD: Streambank | |
409: | | Title: | | | | Volume/Number: | 2007 May | | | Issuing Agency: | | | | Description: | Watershed planning efforts have evolved considerably over the last couple decades. Previously, such efforts were often top-down processes that focused primarily on single issues. More recently, local groups variously described as place-based or community-led planning initiatives have assumed a larger role in watershed planning and management. At the same time, the importance of comprehensive planning, rather than a single-issue focus, has also been recognized. This manual embraces this evolution in watershed planning and seeks to provide an up-to-date approach to guide locally-driven, comprehensive watershed planning efforts in Illinois. | | | Date Created: | 05 24 2007 | | | Agency ID: | | | | ISL ID: | 000000043301 Original UID: 22805 FIRST WORD: Guidance | |
410: | | Title: | | | | Volume/Number: | 2001 July | | | Issuing Agency: | | | | Description: | As reauthorized on February 4, 1987, the Water Quality Act of 1987 (better known as the Clean Water Act) included a new federal initiative designed to help states cultivate nonpoint source (NPS) pollution control strategies. Section 319 of the Clean Water Act (CWA) was developed to focus on the importance of controlling nonpoint sources of pollution. | | | Date Created: | 04 28 2010 | | | Agency ID: | | | | ISL ID: | 000000043303 Original UID: 22808 FIRST WORD: Illinois' | |
411: | | Title: | | | | Volume/Number: | 2001 July | | | Issuing Agency: | | | | Description: | As reauthorized on February 4, 1987, the Water Quality Act of 1987 (better known as the Clean Water Act) included a new federal initiative designed to help states cultivate nonpoint source (NPS) pollution control strategies. Section 319 of the Clean Water Act (CWA) was developed to focus on the importance of controlling nonpoint sources of pollution. | | | Date Created: | 04 28 2010 | | | Agency ID: | | | | ISL ID: | 000000043304 Original UID: 22808 FIRST WORD: Illinois' | |
412: | | Title: | | | | Volume/Number: | 2007 February | | | Issuing Agency: | | | | Description: | The Streambank Cleanup And Lakeshore Enhancement (SCALE) program was started by the Illinois Environmental Protection Agency (Illinois EPA) in 2003. The Illinois EPA continued support of the SCALE program by providing financial assistance to selected applicants to conduct lakeshore and streambank cleanup events in 2005 and 2006. The program, funded through Section 319 of the Clean Water Act, provides up to $3,500 to each group to help with their cleanup efforts. The funds are typically used for safety attire, dumpster rentals, landfill tipping fees and promotional materials. SCALE funds are available only to organizations that have already established a recurring streambank or lakeshore cleanup. | | | Date Created: | 02 28 2007 | | | Agency ID: | | | | ISL ID: | 000000043305 Original UID: 22809 FIRST WORD: Streambank | |
413: | | Title: | | | | Volume/Number: | 2009 April | | | Issuing Agency: | | | | Description: | This project ran from September 1, 2006 through January 31, 2009. Program implementation began in October 2006, when Illinois EPA announced the 2007 SCALE program and application deadline. An identical implementation process was carried out for the 2008 SCALE program starting in October 2007. | | | Date Created: | 06 22 2009 | | | Agency ID: | | | | ISL ID: | 000000043306 Original UID: 22810 FIRST WORD: Streambank | |
414: | | Title: | | | | Volume/Number: | 2011 February | | | Issuing Agency: | | | | Description: | The contract period for this project was November 30, 2008 through January 31, 2011. Program implementation began in September 2008, when Illinois EPA announced the 2009 SCALE program and application deadline. An identical implementation process and timeline was carried out for the 2010 SCALE program within this same grant. | | | Date Created: | 04 04 2011 | | | Agency ID: | | | | ISL ID: | 000000043307 Original UID: 22812 FIRST WORD: Streambank | |
415: | | Title: | | | | Volume/Number: | 2003 August | | | Issuing Agency: | | | | Description: | The purpose of this report is to *Fulfill the requirements set forth in Section 303(d) of the federal Clean Water Act (CWA) and the Water Quality Planning and Management regulation at 40 CFR Part 130 for the year 2002; *Inform the public about the Total Maximum Daily Load (TMDL) program/process. This report is submitted to the USEPA for review and approval of Illinois' list of water quality limited waters. It provides the states supporting documentation required by 40 CFR Part 130.7 and rationale in fulfilling Section 303(d) requirements. | | | Date Created: | 12 09 2002 | | | Agency ID: | IEPA/BOW/03-016 | | | ISL ID: | 000000043308 Original UID: 22814 FIRST WORD: Illinois | |
416: | | Title: | | | | Volume/Number: | 2005 July | | | Issuing Agency: | | | | Description: | Illinois EPA announced the 2003 pilot SCALE program in December 2002. An application package was sent to approximately 100 civic and environmental groups. The mailing list included Section 319 applicants, regional planning commissions and local government offices throughout the state and citizen organizations that were known to have already held a clean up. | | | Date Created: | 10 25 2007 | | | Agency ID: | | | | ISL ID: | 000000043309 Original UID: 22815 FIRST WORD: Streambank | |
417: | | Title: | | | | Volume/Number: | 2001 September | | | Issuing Agency: | | | | Description: | Grants issued by the U.S. Environmental Protection Agency under section 319 of the Clean Water Act include a condition requiring the submittal of a status report every six months. Nonpoint source pollution is the diffuse, intermittent runoff of pollutants from various sources. Major sources that contribute to Illinois' nonpoint source pollution problems are agriculture, construction erosion, urban runoff, hydrologic modifications, and resoure extraction activities. | | | Date Created: | 08 15 2001 | | | Agency ID: | | | | ISL ID: | 000000043312 Original UID: 22818 FIRST WORD: State | |
418: | | Title: | | | | Volume/Number: | 2001 September | | | Issuing Agency: | | | | Description: | Grants issued by the U.S. Environmental Protection Agency under section 319 of the Clean Water Act include a condition requiring the submittal of a status report every six months. Nonpoint source pollution is the diffuse, intermittent runoff of pollutants from various sources. Major sources that contribute to Illinois' nonpoint source pollution problems are agriculture, construction erosion, urban runoff, hydrologic modifications, and resoure extraction activities. | | | Date Created: | 08 15 2001 | | | Agency ID: | | | | ISL ID: | 000000043313 Original UID: 22818 FIRST WORD: State | |
419: | | Title: | | | | Volume/Number: | 2002 September | | | Issuing Agency: | | | | Description: | Grants issued by the U.S. Environmental Protection Agency under section 319 of the Clean Water Act include a condition requiring the submittal of a status report every six months. Nonpoint source pollution is the diffuse, intermittent runoff of pollutants from various sources. Major sources that contribute to Illinois' nonpoint source pollution problems are agriculture, construction erosion, urban runoff, hydrologic modifications, and resoure extraction activities. | | | Date Created: | 07 18 2002 | | | Agency ID: | | | | ISL ID: | 000000043314 Original UID: 22819 FIRST WORD: State | |
420: | | Title: | | | | Volume/Number: | 2002 September | | | Issuing Agency: | | | | Description: | Grants issued by the U.S. Environmental Protection Agency under section 319 of the Clean Water Act include a condition requiring the submittal of a status report every six months. Nonpoint source pollution is the diffuse, intermittent runoff of pollutants from various sources. Major sources that contribute to Illinois' nonpoint source pollution problems are agriculture, construction erosion, urban runoff, hydrologic modifications, and resoure extraction activities. | | | Date Created: | 07 18 2002 | | | Agency ID: | | | | ISL ID: | 000000043315 Original UID: 22819 FIRST WORD: State | |
|