Illinois State Library

Electronic Documents of Illinois


Search results for

Search:
P* in FirstWord [X]
Illinois Department of Transportation in Organization [X]
rss icon RSS
Results:  205 Items
Sorted by:  
Page: Prev  1 2 3 4 5   ...  Next
Organization
Illinois Department of Transportation[X]
XMLRecordID
000000021297 (2)
000000021298 (2)
000000021299 (2)
000000021300 (2)
000000021304 (2)
DateCreated
61:

Title:  

Portland Cement Concrete Level II Technician Course 2007 Appendices

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  04 01 2014 
 Agency ID:   
 ISL ID:  000000049681   Original UID: 170874 FIRST WORD: Portland 
62:

Title:  

Portland Cement Concrete Level II Technician Course 2007

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049682   Original UID: FIRST WORD: Portland 
63:

Title:  

Portland Cement Concrete Level III Technician Course 2007

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049683   Original UID: FIRST WORD: Portland 
64:

Title:  

Portland Cement Concrete Level III Technician Course 2007

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:  04 01 2014 
 Agency ID:   
 ISL ID:  000000049684   Original UID: 170875 FIRST WORD: Portland 
65:

Title:  

Portland Cement Concrete Level III Technician Course 2007 Appendices

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:  04 01 2014 
 Agency ID:   
 ISL ID:  000000049685   Original UID: 170876 FIRST WORD: Portland 
66:

Title:  

Portland Cement Concrete Level I Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level I PCC Technician. The manual discusses the various aspects to make concrete adjustments, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049697   Original UID: FIRST WORD: Portland 
67:

Title:  

Portland Cement Concrete Level I Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level I PCC Technician. The manual discusses the various aspects to make concrete adjustments, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049698   Original UID: 170892 FIRST WORD: Portland 
68:

Title:  

Portland Cement Concrete Level I Technician Course 2006 Appendices

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level I PCC Technician. The manual discusses the various aspects to make concrete adjustments, for Illinois Department of Transportation herein referred to as IDOT or the Department , Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049699   Original UID: 170893 FIRST WORD: Portland 
69:

Title:  

Portland Cement Concrete Level II Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049700   Original UID: FIRST WORD: Portland 
70:

Title:  

Portland Cement Concrete Level II Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049701   Original UID: 170894 FIRST WORD: Portland 
71:

Title:  

Portland Cement Concrete Level II Technician Course 2006 Appendices

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049702   Original UID: 170895 FIRST WORD: Portland 
72:

Title:  

Portland Cement Concrete Level III Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000049703   Original UID: FIRST WORD: Portland 
73:

Title:  

Portland Cement Concrete Level III Technician Course 2006

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049704   Original UID: 170896 FIRST WORD: Portland 
74:

Title:  

Portland Cement Concrete Level III Technician Course 2006 Appendices

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:  04 02 2014 
 Agency ID:   
 ISL ID:  000000049705   Original UID: 170897 FIRST WORD: Portland 
75:

Title:  

Portland Cement Concrete Level I Technician Course

 
 Volume/Number:  2014  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level I PCC Technician. The manual discusses the various aspects to make concrete adjustments, for Illinois Department of Transportation herein referred to as IDOT or the Department , Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  10-31-2014 
 Agency ID:   
 ISL ID:  000000052806   Original UID: 174029 FIRST WORD: Portland 
76:

Title:  

Portland Cement Concrete Level I Technician Course

 
 Volume/Number:  2015  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level I PCC Technician. The manual discusses the various aspects to make concrete adjustments, for Illinois Department of Transportation herein referred to as IDOT or the Department , Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  10-29-2015 
 Agency ID:   
 ISL ID:  000000058668   Original UID: 179886 FIRST WORD: Portland 
77:

Title:  

Portland Cement Concrete Level II Technician Course

 
 Volume/Number:  2016  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level II PCC Technician. The manual discusses the various aspects to proportion portland cement concrete, for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual discusses various test methods, but any question regarding the correct test method shall be resolved by the Manual of Test Procedures for Materials, which has precedence over this manual. 
 Date Created:  01-05-2016 
 Agency ID:   
 ISL ID:  000000058669   Original UID: 179887 FIRST WORD: Portland 
78:

Title:  

Portland Cement Concrete Level III Technician Course

 
 Volume/Number:  2016  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Level III Portland Cement Concrete PCC Technician. The main focus of the manual is to provide a procedure to design concrete mixes for Illinois Department of Transportation herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual summarizes various specifications, but project contract specifications shall govern in all cases. 
 Date Created:  02-02-2015 
 Agency ID:   
 ISL ID:  000000058670   Original UID: 179889 FIRST WORD: Portland 
79:

Title:  

Portland Cement Concrete Tester Course

 
 Volume/Number:  2015  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Concrete Tester. The manual discusses the various tests performed on plastic portland cement concrete, for Illinois Department of Transportation, herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual is intended only to provide basic information to perform tests, and shall not be used to replace the Department's Manual of Test Procedures for Materials which shall have precedence when determining the correct method to perform a test. 
 Date Created:  12-28-2015 
 Agency ID:   
 ISL ID:  000000058671   Original UID: 179890 FIRST WORD: Portland 
80:

Title:  

Portland Cement Concrete Tester Course

 
 Volume/Number:  2014  
 Issuing Agency:   
 Description:  This manual has been prepared to train the student to become a Concrete Tester. The manual discusses the various tests performed on plastic portland cement concrete, for Illinois Department of Transportation, herein referred to as IDOT or the Department, Quality Control/Quality Assurance QC/QA projects. The manual is intended only to provide basic information to perform tests, and shall not be used to replace the Department's Manual of Test Procedures for Materials which shall have precedence when determining the correct method to perform a test. 
 Date Created:  02-19-2015 
 Agency ID:   
 ISL ID:  000000058672   Original UID: 179891 FIRST WORD: Portland 
Page: Prev  1 2 3 4 5   ...  Next