Organization • | Illinois Environmental Protection Agency | [X] |
| 1: | | Title: | | | | Volume/Number: | 2008 August | | | Issuing Agency: | | | | Description: | This fact sheet provides basic information on diesel truck idling, what laws have been passed against it, and why it is bad to leave a truck idling. | | | Date Created: | 02 11 2009 | | | Agency ID: | | | | ISL ID: | 000000040534 Original UID: 20691 FIRST WORD: Ladies | |
2: | | Title: | | | | Volume/Number: | 2004 November | | | Issuing Agency: | | | | Description: | This paper documents the link between the permits and the TMDLs in terms of approximate timeframes and a step-wise sequence. The deadlines for each permit may vary according to public input, staff resources, and other considerations. We believe that the adaptive management and phased approach described in the TMDLs requires a rigid, step-wise application of the implementation plan. | | | Date Created: | 02 04 2005 | | | Agency ID: | | | | ISL ID: | 000000041302 Original UID: 21164 FIRST WORD: Link | |
3: | | Title: | | | | Volume/Number: | 2013 February 20 | | | Issuing Agency: | | | | Description: | Partners for Clean Air (Illinois PFCA) is issuing a last call for students planning to submit a contest entry to the Shoot for the Skies PSA Video Contest. Submissions are due by Friday, March 15 at 5:00 p.m. Through the contest, students are asked to write, direct and produce a :60 television PSA utilizing their talent, creativity and inspiration to educate the general public about the importance of Chicago area air quality and the simple actions we can all take every day to protect our health, and improve air quality. | | | Date Created: | 02 20 2013 | | | Agency ID: | 151**13 | | | ISL ID: | 000000045112 Original UID: 26386 FIRST WORD: Last | |
4: | | Title: | | | | Volume/Number: | 2023 June 29 | | | Issuing Agency: | | | | Description: | There are two main factors (technical and financial) that drive the work behind lead service line replacement. As discussed throughout this report, when considering technical matters this Advisory Board recommends that special attention be given to evaluating replacement options, replacement methods and administrative challenges. Key challenges highlighted in this report include the ability to: establish an accurate inventory of lead service lines; collaborate with homeowners, property owners and other community water supplies; and, ensure a sufficient workforce. More importantly, these and other technical concerns and challenges may impact a community water supply's ability to timely and adequately comply with the Acts requirement to replace all lead service lines. | | | Date Created: | 07-03-2023 | | | Agency ID: | | | | ISL ID: | 000000108003 Original UID: 214713 FIRST WORD: Lead | |
5: | | Title: | | | | Volume/Number: | 2017 | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 02-14-2017 | | | Agency ID: | | | | ISL ID: | 000000067145 Original UID: 186785 FIRST WORD: La | |
6: | | Title: | | | | Volume/Number: | 2020 July 2 | | | Issuing Agency: | | | | Description: | Press Release: El Director de la EPA de Illinois John J. Kim hoy anuncio que la agencia va a ofrecer horas extendidas en todas las 12 ubicaciones de prueba de emisin para vehiculos. | | | Date Created: | 07-02-2020 | | | Agency ID: | | | | ISL ID: | 000000088670 Original UID: 199703 FIRST WORD: La | |
7: | | Title: | | | | Volume/Number: | 2014 June | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 06-19-2014 | | | Agency ID: | | | | ISL ID: | 000000052205 Original UID: 173379 FIRST WORD: Little | |
8: | | Title: | | | | Volume/Number: | 2018 May | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 06-29-2017 | | | Agency ID: | IEPA/BOW/18-002 | | | ISL ID: | 000000068430 Original UID: 187904 FIRST WORD: Little | |
9: | | Title: | | | | Volume/Number: | 2010 July 1 | | | Issuing Agency: | | | | Description: | Press Release: Attorney General Lisa Madigan and Illinois Environmental Protection Agency (IEPA) Director Doug Scott announced today that Ray F. Landers, of Auburn, and Next Generation Ministries, Inc., formerly known as Equipping the Saints Ministry International, Inc., were sentenced June 24, 2010, in Macoupin County Circuit Court for placing residents of Virden at risk of potential serious physical harm from exposure to asbestos emissions. | | | Date Created: | 07 01 2010 | | | Agency ID: | 784**10 | | | ISL ID: | 000000030224 Original UID: 14134 FIRST WORD: Landers, | |
10: | | Title: | | | | Volume/Number: | 1997 November | | | Issuing Agency: | | | | Description: | The purpose of lake aeration in lake management is to increase the dissolved oxygen content of the water. Various systems are available to help do this--by either injecting air, mechanically mixing or agitating the water, or even injecting pure oxygen. | | | Date Created: | 12 08 2006 | | | Agency ID: | | | | ISL ID: | 000000039777 Original UID: 20284 FIRST WORD: Lake | |
11: | | Title: | | | | Volume/Number: | 2017 July | | | Issuing Agency: | | | | Description: | This report addresses Stage 1 TMDL development for the Lake Lou Yaeger watershed. Stage 1 includes: watershed characterization, data analysis, and methodology selection. | | | Date Created: | 07-26-2017 | | | Agency ID: | | | | ISL ID: | 000000066888 Original UID: 186325 FIRST WORD: Lake | |
12: | | Title: | | | | Volume/Number: | February 2021 | | | Issuing Agency: | | | | Description: | This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. | | | Date Created: | 11-17-2020 | | | Agency ID: | IEPA/BOW/IL-2021-002 | | | ISL ID: | 000000090021 Original UID: 201168 FIRST WORD: Lake | |
13: | | Title: | | | | Volume/Number: | 2012 June 11 | | | Issuing Agency: | | | | Description: | The Illinois EPA is responsible by law and regulation for permitting the design and construction and overseeing the operation of landfills and pollution control facilities in Illinois. As part of that responsibility, the Agency today issued an Operating Permit for the North Unit-Phase 6 of the existing Winnebago Landfill, a 433 acre landfill located in Winnebago County. This Operating Permit is required for this unit before waste can be placed in this area of the landfill. In December 2005, a Development Permit was issued that allowed the Northern Unit to be constructed. | | | Date Created: | 06 11 2012 | | | Agency ID: | 645**12 | | | ISL ID: | 000000044039 Original UID: 23547 FIRST WORD: [Letter | |
|