Organization • | Illinois Department of Transportation | [X] |
| 361: | | Title: | | | | Volume/Number: | 2012 August 22 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announces today that weather permitting, construction work on Rockton Road at the IL 251 interchange will begin on Monday, August 27, 2012. William Charles Construction Company is the contractor for the $254,380 project to resurface Rockton Road through the interchange area. | | | Date Created: | 08 22 2012 | | | Agency ID: | | | | ISL ID: | 000000045266 Original UID: 24584 FIRST WORD: Rockton | |
362: | | Title: | | | | Volume/Number: | 2012 August 17 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation, located in Dixon, announces that a lane closure will be installed on I-74 between I-280 and Illinois 5 in Moline. Lane closures will be present in both the center and driving lanes at different times of the day. This closure will be on Tuesday, August 21, 2012 and Wednesday, August 22, 2012 from 9:00 AM to 3:00 PM. | | | Date Created: | 08 17 2012 | | | Agency ID: | | | | ISL ID: | 000000045267 Original UID: 24585 FIRST WORD: Lane | |
363: | | Title: | | | | Volume/Number: | 2012 August 14 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announces today that weather permitting, construction work on Harrison Road northwest of Rockford will begin on Monday, August 20, 2012. Martin and Company Excavating will be making improvements to the 0.7 mile section of roadway south of Harrison between Wishop Road and Oliver Road. | | | Date Created: | 08 14 2012 | | | Agency ID: | | | | ISL ID: | 000000045269 Original UID: 24587 FIRST WORD: Harrison | |
364: | | Title: | | | | Volume/Number: | 2012 August 9 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation, located in Dixon, announces that a lane closure will be installed on Illinois Route 5 Eastbound, at the ramp to Interstate 80 Eastbound in Rock Island County. A lane closure will be in the driving lane. This closure will be on Monday, August 13, 2012 from 8:00 AM to 3:00 PM. | | | Date Created: | 08 09 2012 | | | Agency ID: | | | | ISL ID: | 000000045270 Original UID: 24588 FIRST WORD: Illinois | |
365: | | Title: | | | | Volume/Number: | 2012 August 9 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation, located in Dixon, announces that weather permitting a lane closure will be installed on Interstate 80 westbound in the driving lane between mile marker 4 and mile marker 3 in Rock Island County, Illinois. This closure will begin on Monday, August 13, 2012 at 8:00 AM and conclude by 2:00 PM on Thursday, August 16, 2012. | | | Date Created: | 08 09 2012 | | | Agency ID: | | | | ISL ID: | 000000045271 Original UID: 24590 FIRST WORD: Interstate | |
366: | | Title: | | | | Volume/Number: | 2012 August 9 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announces today that weather permitting, construction work on IL 75 in Rockton will begin on Monday, August 13, 2012. Rock Road Companies is starting the $65,609 contract to improve the 0.3 mile of IL 75 north of the Rock River Bridge. | | | Date Created: | 08 09 2012 | | | Agency ID: | | | | ISL ID: | 000000045272 Original UID: 24591 FIRST WORD: IL | |
367: | | Title: | | | | Volume/Number: | 2012 September 21 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced a daytime lane restriction will be encountered on the McKinley Bridge on Tuesday, September 25, 2012. The lane restriction is needed to perform a bridge inspection. | | | Date Created: | 09 21 2012 | | | Agency ID: | | | | ISL ID: | 000000045274 Original UID: 24635 FIRST WORD: McKinley | |
368: | | Title: | | | | Volume/Number: | 2012 September 19 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that intermittent lane closures will be implemented in the eastbound lanes of Interstate 64/55/70 just east of the Poplar Street Bridge near Fourth Street on Thursday morning September 20, 2012. These closures will be necessary to perform modifications to existing overhead signing. | | | Date Created: | 09 19 2012 | | | Agency ID: | | | | ISL ID: | 000000045275 Original UID: 24636 FIRST WORD: I | |
369: | | Title: | | | | Volume/Number: | 2012 September 17 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announced that on Sunday, September 23rd from 6:00 AM until 7:00 PM, First Street will be reduced to one lane traffic between Exchange Avenue and St. Clair Avenue (IL 3) in Fairmont City / East St. Louis, weather permitting. Two-way traffic will be maintained using flaggers. | | | Date Created: | 09 17 2012 | | | Agency ID: | | | | ISL ID: | 000000045276 Original UID: 24637 FIRST WORD: Fairmont | |
370: | | Title: | | | | Volume/Number: | 2012 September 13 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announced that on Wednesday, September 19th through Friday, September 21st from 7:00 PM until 6:00 AM the following morning, both eastbound and westbound I-64 will be reduced to one lane traffic between the I-55/70/64 split and 18th Street in East St. Louis, weather permitting. In addition, the ramp from westbound I-70 to eastbound I-64 will be temporarily CLOSED during these same overnight hours. Traffic will be detoured using IL 203 to Collinsville Rd to Exchange Ave to 11th St to Baugh Ave to 15th St to St. Clair Ave and back to eastbound I-64. | | | Date Created: | 09 13 2012 | | | Agency ID: | | | | ISL ID: | 000000045277 Original UID: 24639 FIRST WORD: East | |
371: | | Title: | | | | Volume/Number: | 2012 September 10 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation announced that lane closures will occur on eastbound and westbound I-70 from 2 miles east of I-55/70/270 interchange (17 MM) to the U.S. Route 40 interchange at Pocahontas (36 MM). These lane closures are necessary to remove and replace areas of damaged pavement in various locations. Work will begin on Monday, September 10, 2012 and should be completed by October 11, 2012, weather permitting. | | | Date Created: | 09 10 2012 | | | Agency ID: | | | | ISL ID: | 000000045278 Original UID: 24641 FIRST WORD: I | |
372: | | Title: | | | | Volume/Number: | 2012 September 5 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that eastbound I-64 will be reduced to one lane between the I-55/70/64 split and 18th Street in East St. Louis beginning at 8:00 pm September 6, 2012 until 6:00 am the following morning, weather permitting. These lane restrictions are necessary to remove a sign truss over eastbound I-64. Motorists should also expect 15 minute closures while the truss is being lifted from over the traffic lanes. Traffic will be allowed to clear after each closure. Although delays are expected to be minimal, please consider alternate routes or use extra caution when traveling through this area. The contractor on this project is Keeley and Sons from East St. Louis, Illinois. John Scheibal is the Supervising Field Engineer for the Illinois Department of Transportation in this area. | | | Date Created: | 09 06 2012 | | | Agency ID: | | | | ISL ID: | 000000045279 Original UID: 24642 FIRST WORD: Eastbound | |
373: | | Title: | | | | Volume/Number: | 2012 July 3 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportations District 8 today announced that repairs to IL 255 near Seminary Road will begin Thursday, July 5, 2012. The work is necessary to repair the embankment in this location. After a geotechnical investigation of the soil, a lowering of the roadway profile is needed. This requires the removal of approximately 20 feet of the embankment, and the construction of new asphalt pavement and shoulders. After the completion of these repairs, the new section of IL 255 between Seminary to Humbert Road can reopen. IDOT worked closely with State Representative Dan Beiser and State Senator William Haine to move this project forward. | | | Date Created: | 07 03 2012 | | | Agency ID: | | | | ISL ID: | 000000045280 Original UID: 24672 FIRST WORD: IL | |
374: | | Title: | | | | Volume/Number: | 2012 August 1 | | | Issuing Agency: | | | | Description: | The proposed work on the eastbound flood gates located on IL Route 3 (Lewis and Clark Blvd./Broadway) at the Bridge over Wood River Creek in East Alton/Alton, IL has been postponed due to extenuating circumstances. Therefore, there will be no lane closures from Aug. 2, 2012 thru Aug. 6, 2012, as was proposed in the previous press release which was sent out on Thursday, July 26, 2012. | | | Date Created: | 07 26 2012 | | | Agency ID: | | | | ISL ID: | 000000045284 Original UID: 24652 FIRST WORD: IL | |
375: | | Title: | | | | Volume/Number: | 2012 July 25 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that there will be a lane closure on IL Route 111 in Hartford for one day only, Tuesday, July 31, 2012, weather permitting. This closure is necesssary to repair the existing pavement. Please use caution when travelling through this area. Signing and traffic control devices will be provided to aid motorists through the work zones. This work is being done by Kilian Corporation of Mascoutah, Illinois. Barry Gibbs is the Supervising Field Engineer for the Illinois Department of Transportation in this area. | | | Date Created: | 07 25 2012 | | | Agency ID: | | | | ISL ID: | 000000045285 Original UID: 24653 FIRST WORD: IL | |
376: | | Title: | | | | Volume/Number: | 2012 July 17 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that the ramp from westbound I-64 to eastbound I-55/70 in East St. Louis will be closed to all traffic beginning Monday, July 23, 2012, weather permitting. This ramp closure is necessary to remove retaining walls and construct new bridges associated with the new Mississippi River Bridge. All traffic will be detoured around this area using I-255 to I-55/70. This work is expected to be completed by January 31, 2013. The contractor on this project is Keeley and Sons, Inc. of East St. Louis, Illinois. John Scheibal is the Supervising Field Engineer for the Illinois Department of Transportation in this area. | | | Date Created: | 07 17 2012 | | | Agency ID: | | | | ISL ID: | 000000045286 Original UID: 24654 FIRST WORD: Ramp | |
377: | | Title: | | | | Volume/Number: | 2012 July 6 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation has announced that daytime lane closures on Illinois Route 15 just east of St. Libory will begin on Monday, July 9, 2012, weather permitting. These lane restrictions will be needed during shoulder widening operations. Motorists are urged to use caution and allow extra time when traveling through the work zone. This work should be completed by August 8, 2012. The contractor on this project is Christ Bros. Asphalt Inc. of Lebanon, Illinois. Steve Putz is the Supervising Field Engineer for the Illinois Department of Transportation in this area. | | | Date Created: | 07 06 2012 | | | Agency ID: | | | | ISL ID: | 000000045287 Original UID: 24658 FIRST WORD: IL | |
378: | | Title: | | | | Volume/Number: | 2012 July 6 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that lane restrictions will be encountered on IL-255 from I-270 to IL 143 beginning Monday, July 9, 2012, weather permitting. These lane restrictions are necessary to install rumble strips on the existing shoulders next to the edge of pavement. These closures will begin after 9:00 a.m. and be reopened by 3:00 p.m., daily. | | | Date Created: | 07 06 2012 | | | Agency ID: | | | | ISL ID: | 000000045288 Original UID: 24659 FIRST WORD: IL | |
379: | | Title: | | | | Volume/Number: | 2012 July 10 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that IL 160, 1 mile south of Addieville, will be reduced to one lane beginning Monday, July 23, 2012 at 7:00 a.m., weather permitting. The lane closure is necessary to replace a box culvert. It is anticipated this work will be completed on August 9, 2012. | | | Date Created: | 07 10 2012 | | | Agency ID: | | | | ISL ID: | 000000045290 Original UID: 24661 FIRST WORD: Illinois | |
380: | | Title: | | | | Volume/Number: | 2012 June 29 | | | Issuing Agency: | | | | Description: | The Illinois Department of Transportation today announced that there will be daytime lane closures on US Route 40 from Overpass Road to Silver Street just west of IL 127 and on IL Route 127 from Main Street to College Avenue beginning Thursday, July 5, 2012, weather permitting. These lane closures are necessary to perform pavement patching and milling and resurfacing of the existing pavement. Please observe caution when travelling through this area. It is estimated that the project will be completed by October 12, 2012. Signing and traffic control devices will be provided to aid motorists. | | | Date Created: | 06 29 2012 | | | Agency ID: | | | | ISL ID: | 000000045291 Original UID: 24671 FIRST WORD: US | |
|