Electronic Documents of Illinois
Document Identification
Users should pay particular attention to version identification or dates of publication of documents retrieved. Earlier, possibly superseded, versions of documents are also stored here. TitleArchitect/Engineer Manual
- The State of Illinois Capital Development Board Architect/Engineer Manual of May 1997 includes: Definitions, A/E's Rights and Responsibilities, CDB Rights and Responsibilities, Compensation and payment, Insurance requirements, Termination and Suspension of the agreement, General Provisions, Alternative Dispute Resolution (ADR), Statutory requirements, General Services, Project Budget and Estimating, Programming, Program Analysis, and Design Phase, Bidding Documents Preparation, Design Criteria and Guidelines, CDB Review of Design, Bidding Phase, Awarding of Construction Contracts, Construction Phase, Quality Control, Performance Testing, Start-up and Training, Project Closeout Phase and Exhibits.
Originally Deposited as: 2552
Published By: Phone Number: Language(s): EN-English Volume or Year: 1997 Number or Issue: May Date Created: 11 07 1997 Date Last Modified: 11 07 1997 Librarian Remarks: |
Access This Publication
1. Architect/Engineer Manual (aemanual.pdf).Document Size:300506 Software: Acrobat Distiller Version: 3.0 for Windows This is part of a series. It is part of Architect/Engineer Manual: 6872